Frontiera-Curtici-Simeria Railway railway line
SDG Obiettivi di sviluppo sostenibile


Lots 2A and 2B: rehabilitation of about 80 km of the Frontieră – Curtici – Simeria railway line, part of Pan-European Corridor IV. Contracts include also the construction of 11 stations, 30 bridges, a tunnel and the ERTMS telecommunication and signaling system. Works are financed 75% by European funds (POIM Program) and 25% by state funds.
Lot 3: rehabilitation of 40 km of the railway line in the section between Gurasada and Simeria of the 614 Km – Radna – Simeria section. The project includes the construction of about 20 bridges, electrification, installation of the ERTMS, renovation of about 10 railway stations and some minor works. The works are financed 75% by EU funds (POIM Program) and 25% by the State.
Technical data
Tunnels (km)
3.5
Bridges
51
Stations
20
Sustainability
Benefits and advantages
Co2 emissions avoided per year
7,124 t
Passengers expected per year
653,567