S7 Widoma - Krakow

Roads & Motorways
S7 Widoma - Krakow
SDG Obiettivi di sviluppo sostenibile
Industry innovation and infrastructure Industry innovation and infrastructure

The project involves the design and building of a section called Lot 3 of the S7 Expressway. The section, which will stretch between Widoma and Krakow, will be 18.3-kilometre long and have four lanes, with two in either direction.

The project includes the construction of 38 structures, including overpasses, bridges, animal crossings and a two-kilometre viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south.

Technical data

Length

18 km